Engineering service

Solar Site Supervision

Site coordination and review support for solar installation work, based on the agreed project scope, approved drawings and reporting responsibilities.

Why the detail matters

Start with the real project conditions.

Site support works best when the drawing status, visit frequency, reporting process and boundaries of responsibility are clear. The agreed role should not be confused with the contractor's own quality, safety or execution responsibilities.

The first review should establish what information is available, what assumptions are proposed and which decisions the work must support. Any limitations that affect the conclusions should be recorded before the deliverable is used by the wider team.

Scope and inputs

What helps us assess the work?

The required information changes by service. These are useful starting points; the final input list should match the actual project.

01

Project context

Site location, project type, current stage, intended use and the decision or outcome needed.

02

Technical inputs

Available drawings, loading criteria, equipment data, surveys or geotechnical information where relevant.

03

Clear boundaries

Agreed deliverables, assumptions, exclusions, review responsibilities, revisions and timing.

Related services

Where the scope connects.

Some assignments need coordination across more than one workstream. Any combined scope should be agreed before work begins.

Solar Mounting Structure Design

Structural engineering support for module mounting structures, including load paths, member checks, stability, connections and deflection review based on project-specific criteria.

Explore service ↗

Rooftop Solar Structural Assessment

Review available drawings and site information to understand how the roof and supporting structure may respond to additional solar dead, maintenance and wind loads.

Explore service ↗

Solar Foundation Engineering

Coordinate foundation design with structural reactions and project-specific geotechnical information. The final solution should reflect actual ground conditions and installation constraints.

Explore service ↗
Good questions to ask

Questions about solar site supervision

Practical answers about the inputs, limitations and deliverables that matter for this kind of work.

What does site supervision cover?

The exact role should be agreed in writing and may include scheduled visits, observations against approved drawings, coordination of engineering queries and reporting. It should not imply responsibilities that have not been assigned.

How often are site visits required?

That depends on the work sequence, risk, location and support required. The proposed frequency and what each visit covers should be confirmed before the work starts.

Can site supervision replace the contractor's quality checks?

No. Contractor responsibilities, quality control, safety management and the consultant's review scope are distinct and should remain clear in the project documents.

What should be ready before a site visit?

The current approved drawings, access arrangements, progress status and a list of open technical questions help make a visit useful. Site-specific safety and entry requirements should also be confirmed.

Have a related requirement?

Let's define the scope before assuming the solution.

Share the site, the project stage and the information already available.

Start an enquiry ↗