Project context
Site location, project type, current stage, intended use and the decision or outcome needed.
Early-stage structural and site coordination to identify constraints before detailed design, procurement and installation decisions are locked.
Early coordination can identify access, layout, structural and information gaps while options are still being considered. Preliminary observations should remain distinct from final design conclusions.
The first review should establish what information is available, what assumptions are proposed and which decisions the work must support. Any limitations that affect the conclusions should be recorded before the deliverable is used by the wider team.
The required information changes by service. These are useful starting points; the final input list should match the actual project.
Site location, project type, current stage, intended use and the decision or outcome needed.
Available drawings, loading criteria, equipment data, surveys or geotechnical information where relevant.
Agreed deliverables, assumptions, exclusions, review responsibilities, revisions and timing.
Some assignments need coordination across more than one workstream. Any combined scope should be agreed before work begins.
Structural engineering support for module mounting structures, including load paths, member checks, stability, connections and deflection review based on project-specific criteria.
Explore service ↗Review available drawings and site information to understand how the roof and supporting structure may respond to additional solar dead, maintenance and wind loads.
Explore service ↗Coordinate foundation design with structural reactions and project-specific geotechnical information. The final solution should reflect actual ground conditions and installation constraints.
Explore service ↗Practical answers about the inputs, limitations and deliverables that matter for this kind of work.
Early review can identify site and layout constraints, access and maintenance considerations, structural questions and missing inputs. It helps shape the next design steps rather than replacing detailed engineering.
A draft layout is useful, even if it is not final. Clearly label its status so preliminary observations are not mistaken for checks against an approved arrangement.
Yes, but significant changes to spacing, tilt, mounting height, support locations or equipment can affect structural checks. Revisions should be tracked and relevant calculations reviewed again.
Share the site location, available site plan, proposed capacity or array concept, module/system details if known and any access, terrain or existing-structure constraints.
Share the site, the project stage and the information already available.